client login
McDonald Construction Partners | Laurel Signature Plan Elevation A

Crestwood Terrace

4,075 sq. ft.

Rambler

4 Beds + Study

3 Baths

3 Car Garage

  • Dramatic great room/dining room/kitchen with vaulted ceiling & 12’ of sliding patio doors with transoms
  • Chef’s gourmet kitchen with oversized center island & walk-in pantry
  • Main level primary suite with ceramic tile shower, freestanding tub, dual vanities & walk-in closet with laundry room access
  • Main level 2nd bedroom & 3/4 bathroom
  • Main level study with double door entry
  • Spacious mudroom includes built-in bench and walk-in closet
  • Open staircase to lower level
  • Lower level media/game room
  • Lower level 3rd & 4th bedrooms with adjacent 3/4 bathroom
  • Lower level flex/exercise room
  • Large lower level storage room (unfinished)



Greg Hammer

StoneRidge Golf Club
Downtown Stillwater
Saint Croix Vineyards
Lake Elmo Park Reserve

Lakefront Park
Pilot Park
Lake Elmo Park

Afton-Lakeland Elementary
Oak-Land Middle School
Stillwater Area High School

Lake Elmo Inn
Gorman’s
Arnie’s Restaurant @ Royal Golf Club
Manger Restaurant & Wine Bar